I spent Friday and Saturday in Cokeville and we accomplished the following:
Installed the air registers, installed closet rods, rehung the doors (since we had to take them off for painting), installed doorknobs on all the doors, installed the stair banister, installed bathroom hardware (tp holders, towel rods, towel rings), washed windows, and tried to clean up a bit. And while we did that our electrician got to work installing all the light fixtures. And our plumber was suppose to come sometime last week or this week and install toilets and sinks. Electricity and running water...happy day!
And below is a sneak peak of the new kitchen cabinets. I really like them and I really like the layout. I thought the peninsula might be too much and take up too much room, but I think it's the perfect size. We are missing the cabinet that goes above the fridge, as it was too wide and we had to return it and pick up a smaller one in Logan. And the toe-kick area needs some finishing work. But we have our handy man, Bill, working on all those items, so they'll be done soon, if they aren't already.
- Touch-up painting
- Pick-up and install the stove and dishwasher (ordered from Lowes)
- Pick-up and install the back door (special ordered from HD)
- Hang bathroom mirrors
- Install door stops
- Clean, Clean, Clean!